摘要
萍乡发电厂扩建的2台125MW机组,投运以来,通过对设备的完善化治理和优化运行操作,机组热经济性逐年提高。文中从燃烧器结构、炉膛热负荷的选取、热风温度、优化燃烧调整等几方面总结出420t/h锅炉能够保持高燃烧效率运行的一些经验。
Since the commission of two extension 125MW generating units of Pingxiang Power Plant,the operation efficiency of units has been improved gradually through the perfection of equipment and operation optimization.The ohoices of combustor structure and heat load in furnace,temperature of hot air and optimization of combustion regulation etc. are elaborated,and thus some experiences of operation in maintaining high efficiency combustion are summed up in this article.
出处
《中国电力》
CSCD
北大核心
1997年第9期8-11,共4页
Electric Power
关键词
锅炉
燃烧器
燃烧效率
运行
发电厂
boiler combustor burner combustion efficiency operation