期刊文献+

黄河中下游水库群水沙联合调控技术研究 被引量:4

Study on the Water-Sand Joint Regulation by Group of Reservoirs on the Middle and Lower Leaches of the Yellow River
下载PDF
导出
摘要 根据维持黄河下游河槽排洪输沙基本功能的水沙调控指标体系,对黄河不同区域来水进行了分析,提出了小浪底、万家寨、三门峡、故县、陆浑水库的水沙联合调控组合方式,运用神经网络等方法研究了黄河中游水库群水沙联合调度关键问题,包括流量过程、含沙量过程的控制方式及修正模式,并在2005年黄河水沙调控过程中得以运用。 According to the water-sand regulated index system, which sustained the basic function of flood drainage and sediment discharging on the river channel of the lower reaches of the Yellow River, the characteristics of the coming water on different regions are analyzed in this paper, and the combination modes of the water-sand joint regulation involving Xiaolangdi,Wanjiazhai,Sanmenxia, Guxian and Luhun reservoirs are also provided, By the neural network, the key problems of the water-sand joint regulation by group of reservoirs on the middle of the Yellow River are studied, including the controlled manners and amendable patterns on the processes of flows and sand contents. The method is also applied to the process of the water-sand regulation on the Yellow River in 2005.
出处 《南水北调与水利科技》 CAS CSCD 2008年第5期56-59,共4页 South-to-North Water Transfers and Water Science & Technology
基金 国家“十五”科技攻关计划重大项目“水安全保障技术研究”的课题“维持黄河下游排洪输沙基本功能的关键技术研究(2004BA610A-03)”之第四专题“水库水沙调控关键技术”(2004BA610A-03-04)
关键词 水沙调控 水库群 黄河 运用组合 water-sand regulation group of reservoirs Yellow River combination modes of application
  • 相关文献

参考文献5

  • 1李国英.黄河调水调沙[J].人民黄河,2002,24(11):1-4. 被引量:60
  • 2李国英.基于空间尺度的黄河调水调沙[J].人民黄河,2004,26(2):1-4. 被引量:27
  • 3[3]水利部黄河水利委员会.黄河首次调水调沙试验[R].郑州:黄河水利委员会.2004.
  • 4[4]黄河防汛总指挥部办公室.黄河四库水沙联合调度(调水调沙)预案[R].郑州:黄河防汛总指挥部办公室,2003.
  • 5[5]水利部黄河水利委员会.黄河调水调沙试验[R].郑州:水利部黄河水利委员会,2004.

共引文献78

同被引文献56

引证文献4

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部