摘要
介绍了我国现行工程造价的构成,从建设项目的决策、设计、招标、施工和竣工结算与竣工后保修五个阶段就业主方对项目工程造价的管理及应注意的问题进行了深入探讨,从而完善工程建设的各项制度,更好地控制工程造价。
The component of current engineering cost in China was introduced, the government of proprietor on item engineering cost and problems needing attention were discussed deeply form five stages such as decision, design, call for bid, construction and completion of building items, so as to perfect every system of engineering building, control engineering cost better.
出处
《山西建筑》
2008年第28期259-260,共2页
Shanxi Architecture
关键词
业主方
建设项目
造价管理
proprietor, building items, exist government