摘要
阐述了定额计价在工程量清单计价实施初步阶段的影响,从完整性与时效性方面探讨了工程量清单计价应用中主要存在的问题,归纳了解决问题的方法和途径,从而更好地实现对工程造价的有效控制。
It illustrates the influence of quotation valuation on the early implementing stage of the valuation of bills of quantity, discusses the problems existing in the valuation of bills of quantity from integrity and efficiency, and summarizes the method and ways to solve problems, so as to realize better control to project cost.
出处
《山西建筑》
2008年第28期266-267,共2页
Shanxi Architecture
关键词
工程造价
定额计价
工程量清单计价
报价体系
project cost, quotation valuation, the valuation of bills of quantity, cost system