超超临界1000MW机组汽动给水前置泵的安装优化 被引量:3

INSTALLATION OPTIMIZATION OF STEAM-DRIVEN FEED-WATER BOOSTER PUMP FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
下载PDF
导出
摘要 对国电北仑第三发电有限公司(北仑电厂)超超临界1000MW机组汽动给水前置泵的安装位置从距主厂房零米改为17m运转层,并将一体式除氧器抬高至40.5m,提高了机组运行的经济性,改善了厂用电配电条件,减少了设备投资。此改动可为同类型机组的汽动给水前置泵设计、选型提供参考。 The installed location of the steam- driven feed- water booster pump for ultra- supercritical 1 000 MW unit in Beilun Power Plant has been changed from elevation 0 m in the main machine hall onto 17 m operating floor,and the integrated mode deaerator Being heigtened to 10.5 m,thereby,the economic efficiency in operation of unit being enhanced, the distribution condition of service power being improved,and the invested capital of equipments being reduced. This modification can provide reference for design and type ,selection of steam - driven feed - water booster pump used for similar type of unit.
作者 陈建县 陶磊
机构地区 国电北仑电厂
出处 《热力发电》 CAS 北大核心 2008年第9期68-70,74,共4页 Thermal Power Generation
关键词 火电厂 超超临界 1000MW机组 汽动给水泵 前置泵 安装优化 thermal power plant ultra - supereritical 1000MW unit steam - driven feed - water pump booster pump installation optimization
  • 相关文献

参考文献1

  • 1DL5000-2000,火力发电厂设计技术规范[S].

共引文献2

同被引文献12

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部