摘要
结合监理日处理量为50万t的城市二级污水处理设备工程实践,分析探讨在依据设计文件和相关的质量验评标准验收规范基础上,开展监理工作。着重介绍了制订有效合理的监理措施和过程控制中的监理手段和方法。最后介绍了主要机械设备和电气、自控设备安装调试的监控要点。
Based on the engineering practice in supervision of the equipment for the secondary urban sewage treatment works with the daily capacity of 500 000 t, studies are carried out for starting supervision based on the design documents, relevant standards for quality inspection and appraisal and specifications for check and acceptance, with emphasis on preparation of efficient and reasonable measures for supervision and the means and methods thereof during the process control, and finally the key points to be monitored during installation and commissioning of major mechanic, electric and automatic control equipment.
出处
《中国市政工程》
2008年第2期52-54,共3页
China Municipal Engineering
关键词
设备监理
污水处理厂
设备安装调试
监控要点
plant supervision
sewage treatment works
installation and commissioning of plant
key points to be monitored