摘要
小陆家嘴地区大规模的交通设施建设,主要增加新建路、人民路越江隧道和东西通道等。这必然对该地区的交通带来质的变化和巨大压力。通过对单向组织、双向组织等不同方案的比选,寻找合适的优化方法,并通过交通分析评价对优化方案进行验证。
The large scale construction of traffic facilities in Xiaolujiazui Region mainly covers the new river-crossing tunnels at Xinjian Rd. and Renmin Rd. and the East-West Passage, which is inevitably a substantial change and a heavy burden on the traffic of that region. Through comparison of proposals for one-way and two-way traffic arrangement, a way will be found appropriate for optimization, and an optimized proposal will be verified through analysis and appraisal of the traffic.
出处
《中国市政工程》
2008年第2期81-82,84,共3页
China Municipal Engineering