在完成了390MW燃气-蒸汽联合循环机组燃气轮机安装和调试的基础上,本文简要介绍了V94.3A型燃机的特点,并总结了其调试程序和在调试过程中遇到的问题。本文可为建立燃机调试标准提供参考。
Based on the installation and commissioning of the gas turbine in a 390MW gas-steam combined cycle generating unit, the paper gives a brief introduction to the characteristics of V94.3A gas turbine, summarizes the process and the problems in the commissioning. The paper is supposed to be a helpful reference to constitute commissioning standard.
出处
《热力透平》
2008年第3期216-219,共4页
Thermal Turbine