摘要
本文总结了52.5兆瓦蒸发冷却水轮发电机这一新型冷却技术在电站安装中的焊接工艺以及检漏等关键技术,供下一步大型机组的制造安装参考。
This paper summarized the key problems of welding technology and leakage detection for the new cooling system of a 50MW evaporative cooling hydro generator installed in the station. It gives referable experience to manufacturing and installing for later large units
出处
《电工电能新技术》
CSCD
1997年第4期48-52,共5页
Advanced Technology of Electrical Engineering and Energy