本文叙述国产300MW机组给水泵调试中的一些问题及解决办法,为新机组及早投运创造了条件。同时也可为同类型泵组调试时参考。
The problems and its solution in the pre-start test offeed-water pumps in a domestic made 300MW unit were described inthis paper. This work had created a favorable condition to put theunit into operation on schedule and also as a reference to the pre-start test of similar type of feed-water pump.
出处
《华东电力》
1990年第11期1-3,共3页
East China Electric Power