摘要
投资控制作为建设项目管理的一项重要内容,不仅需要具有相应业务能力和敬业精神的专业技术人员,更要做到全方位、全过程、有重点的控制。此文以郑徐电气化工程为例,介绍铁路局及时调整建设管理思路和模式,强化建设管理体制改革,设置精干的管理机构和人员,以合同、设计、现场管理和合同外费用审批为重点,全方位、全过程抓好投资控制,实现投资目标的经验。
As an important part of construction project management, investment control not technical personnel with corresponding professional capability and the spirit of involves an omni -bearing, whole process and emphatic control. This article, only requires specialized respecting work but also taking the Zhengzhou Xuzhou railway electrification project for example, makes an introduction to the experience of the railway administration which adjusted the concept and mode of construction management, strengthening the struc- tural reform on construction management, allocating crack management organs and personnel with con- tract, design, field management and the approval of cost outside the contract as the priority, and did a good job of an omni - bearing and whole process investment control to realize the investment target
出处
《铁路工程造价管理》
2008年第5期35-37,共3页
Railway Engineering Cost Management
关键词
郑徐铁路
电气化工程
投资控制
Zhengzhou - Xuzhou railway
electrification project
investment control