以河南华润登封电厂一期工程2X300MW机组为例,阐述热控系统安装、调试过程中遇到的典型问题,给出具体的技术处理措施,并总结了热控专业在电厂工程建设及调试期间的工作经验和建议。
The first phase 2X300MW unit of Henan Huarun Dengfeng Power Plant is taken as the example and the typical questions in the thermal system installation and debugging process are elaborated. The conerete technical processing measures are given. And the work experience and the suggestion of thermal eontrol specialty during the power plant engineering construction and the debugging period are summarized.