摘要
介绍了原有多层钢筋混凝土厂房,由于不能满足扩建后的生产工艺要求,而对原有结构进行抽柱、加固补强、新旧梁柱连接等的构造进行了改造。
Since the existing multi-stories reinforced concrete fac- tory cannot meet the process requirements after expansion,it is re- constructed by removing the columns,reinforcing,and connecting the new beams and pillars with the old ones.
出处
《石油化工设计》
CAS
2008年第3期17-18,22,共3页
Petrochemical Design
关键词
多层框架厂房抽柱
加固
构造处理
Removal of columns of multi-stories frame factory
Reinforcement
Structure disposal