摘要
针对目前胜利油田海堤防护工程有27.7 km 的临海海堤存在非常严重的安全隐患,根据历史资料分析、数值模拟以及实测资料推算,研究了黄河三角洲地区桩西至黄河海港海域25 a,50 a 一遇渡流共同作用下冲淤变化,得出研究区海域冲淤演化特征。为该海岸段海岸防护工程加固方案的设计、施工以及工程的灾害预测,提供了可借鉴的科学依据。
At present, the defendable projects builed by ShengLi oil field long 27.7 km are in danger, according to a historical material analysis, Numerical model and measured datum calculation, aimed at investigating the changing rules of scouring and filling in the case of once-in-50-years wave and current from Zhuangxi to Yellow River Port, obtained the evolving characters of scouring and filling ,and provided a scientific support for coastal engineerings.
出处
《海洋科学》
CAS
CSCD
北大核心
2008年第9期12-17,共6页
Marine Sciences
基金
国家重点基础研究发展计划项目(2002CB412410)
关键词
桩西
黄河海港
数值模拟
波流共同作用
冲淤演化
Zhuang xi
the Yellow River port
numerical model
joint action of wave and current
changes in scour and silting