戈兰滩碾压混凝土坝设计特点与快速施工综述

A Summary of the Design Characteristics and Fast Construction of the Roller Compacted Concrete Gravity Dam of the Gelantan Hydropower Project
下载PDF
导出
摘要 戈兰滩水电站地处云南南部亚热带季风气候地区,大坝为全断面碾压混凝土重力坝,最大坝高113 m,共分16个坝段,坝顶长466 m。坝体碾压混凝土设计94万m3,常态混凝土约24.5万m3。从2006年9月至2008年7月碾压混凝土施工完毕,浇筑时段仅20个月,这在国内同类坝型中筑坝速度是首屈一指的。 The Gelantan Hydropower Project is located in a subtropical monsoon climate region in south Yun- nan and its water retaining structure is a full - section roller compacted concrete gravity dam with max. height of ll3m and dam crest length of 466m, composed of 16 dam blocks. The dam body consists of 940,000m^3 of roller compacted concrete and 245,000m^3 of normal concrete according to the design. The placement of roller compacted concrete was completed in a period of only 20 months from September 2006 to July 2008, which shows that its speed comes the first in construction of darns of this kind at home.
出处 《云南水力发电》 2008年第B09期41-44,共4页 Yunnan Water Power
关键词 戈兰滩水电站 碾压混凝土坝 设计特点 快速施工 Gelantan Hydropower Project miler compacted concrete dam design features fast construction
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部