摘要
戈兰滩水电站地处云南南部亚热带季风气候地区,大坝为全断面碾压混凝土重力坝,最大坝高113 m,共分16个坝段,坝顶长466 m。坝体碾压混凝土设计94万m3,常态混凝土约24.5万m3。从2006年9月至2008年7月碾压混凝土施工完毕,浇筑时段仅20个月,这在国内同类坝型中筑坝速度是首屈一指的。
The Gelantan Hydropower Project is located in a subtropical monsoon climate region in south Yun- nan and its water retaining structure is a full - section roller compacted concrete gravity dam with max. height of ll3m and dam crest length of 466m, composed of 16 dam blocks. The dam body consists of 940,000m^3 of roller compacted concrete and 245,000m^3 of normal concrete according to the design. The placement of roller compacted concrete was completed in a period of only 20 months from September 2006 to July 2008, which shows that its speed comes the first in construction of darns of this kind at home.
出处
《云南水力发电》
2008年第B09期41-44,共4页
Yunnan Water Power
关键词
戈兰滩水电站
碾压混凝土坝
设计特点
快速施工
Gelantan Hydropower Project
miler compacted concrete dam
design features
fast construction