4T. N. Wong·L. C. F, Chart · H, C. W, Lau. Machining Process Sequencing with Fuzzy Expert System and Genetic Algorithms [J] Engineering with Computers, 2003, (2 - 3 ) : 191 - 202.
5D. -H. Lee, D. Kiritsis, P. Xirouehakis. Iterative Approach to Operation Selection and Sequencing in Process Planning[J]. International Journal of Production Research, 2004, 42 (22): 4745 - 4766.
6Cai Ligang,An Applied Part Model Based on Form Feature Binary Tree for Integrated CAD/CAP/CAM System of Rotational Components,1995年,221页
7ISO.ISO TC184/SC1/WG7,ISO 14649[S]//Data model for computerized numerical controllers.Geneva,Switzerland:ISO,2000.
8SUH S H,CHUNG D H,LEE B E,et al.Architecture and implementation of shop-floor programming system for STEP -compliant CNC[J].Computer-Aided Design,2003,35(12):1069-1083.
9ISO.ISO TC184/SC1/WG7,ISO 14649[S]//Data model for computerized numerical controllers.Part Ⅱ:Process data for milling.Geneva,Switzerland:ISO,2000.
10DETAND J.A computer aided process planning system generating non-linear process plans[D].Leuven,Belgium:Katholieke University Leuven,Department of Mechanical Engineering,1993.
7Rocha J, Ramos C, Vale Z. Process planning using a genet- ic algorithm approach[ A]. Proc of the 1999 IEEE Int Syrup on Assembly and Task Planning [ C ]. Porto, Portugal: IEEE, 1999:82 - 86.
8Shobrys D E,White D C. Planning,scheduling and con- trol systems., why can they not work together[J]. Computer Chemical Engineering,2000(24) .. 163-173.