针对冻结井外壁特殊的早期养护环境,开展了外壁混凝土早期强度增长规律的实验室及现场试验研究.结果表明:受大体积混凝土水化热的影响,外壁混凝土的早期强度增长迅速,1,3,7 d强度分别超过了配制强度的40%,70%,90%.外壁混凝土的早期强度增长速度明显超过标准养护试块,且越接近井壁厚度中央,混凝土的强度越高;龄期越短,上述差异越显著(尤其是3 d内).外壁采用现浇高强混凝土结构,其安全能够得到保障.
The early-stage strength growth of concrete in outer freezing shaft wall was studied by laboratory and field experiment. The results show that the strength growth at early stages proceeds rapidly due to heat of hydration in the mass of concrete. The strength measured at one, three or seven days exceeded the strength of the test article by 40, 70 and 90 percent, respectively. Strength growth in the outer shaft wall significantly exceeds the rate of strength growth in the standard test block. At short times, the closer the sample is to the center of the wall, the higher the strength compared to the test sample. This effect is most noticeable within three days after pouring. The safety of the outer shaft wall can be guaranteed if high-strength cast-in-place concrete is used.
出处
《中国矿业大学学报》
EI
CAS
CSCD
北大核心
2008年第5期595-599,共5页
Journal of China University of Mining & Technology
基金
国家自然科学基金重点项目(50534040)
国家自然科学基金项目(50704033)
中国矿业大学青年科研基金项目(2005A006)的资助
关键词
冻结凿井
外层井壁
高强混凝土
早期强度
freeze sinking
outer shaft wall, high strength concrete, strength at early stage