摘要
针对带转换层高层建筑结构的复杂性,对其施工阶段的受力情况进行了分析,列出了相同结构施工阶段用传统分析方法和分阶段分析方法所得的结果,阐述了建筑物的层数、跨度、施工周期对带转换层高层建筑结构的影响。
Aiming at the complexity of high level construction structure with transformed layer, it analyses the stress of the phase of construction, lists the effects of using the traditional analyses method and the analyses methods by phases in the same structure construction phase, and represents the affection of the layers, span, construction cyclic of the construction to the high level construction structure with transformed layer.
出处
《山西建筑》
2008年第29期108-109,共2页
Shanxi Architecture
关键词
高层建筑
转换层
施工阶段
受力分析
high level construction, transformed layer, the phase of construction, stress analysis