摘要
对冬季大体积混凝土施工全过程进行了分析,从原材料选用、配合比选择、浇筑方案确定、搅拌站生产及现场质量控制等方面进行了论述,达到了大体积混凝土冬季顺利浇筑的效果。
The author analyzes the construction whole proess of the mars concrete in winter, discusses the raw material selection, the mix proportion selection, the determination of the pouring scheme, the production of the mixing station and the site quality control, which achieves the effect of the pouring of the mass concrete in winter.