陈述建设单位与施工单位的技术人员配置差别,介绍施工单位在合同履行过程中的索赔意识;分析施工单位索赔产生的原因,探讨建设单位预防工程索赔的一些有效措施,并总结建设单位预防工程索赔的意义。
This paper states the difference of technician equipment between the construction organization and the development organization, introduces the counterclaim consciousness in the course of carrying out of the construction organization. The causes of proucing counterclaim were analyzed. Some effective methods in the prevent engineering counterclaim of the construction organization were researched. The advantages in the prevent engineering counterclaim of the construction organization were summarized.