期刊文献+

基于结构可靠度的劣化桥梁维护方案成本优化研究 被引量:18

STRUCTURAL RELIABILITY-BASED LIFE-CYCLE COST OPTIMIZATION OF MAINTENANCE INTERVENTIONS FOR DETERIORATING BRIDGES
下载PDF
导出
摘要 在桥梁管理系统中劣化桥梁结构的现有状态的评估和将来状态的预测是非常重要的内容。在预测过程中一方面应计算时变荷载和抗力,另一方面需考虑维持桥梁安全和服务水平的维护策略,这使得桥梁将来状态的预测变的十分复杂和困难。在劣化结构寿命评估和预测过程中要考虑各种参数的不确定性。在改进的结构劣化模型基础上,推导了在各种维护策略下的可靠指标评估公式,研究了维护方案与结构可靠指标的相互关系。提出了在分析寿命周期内的总成本中各单项成本的计算公式。根据寿命周期内成本现值最小的原则,在满足结构性能要求和预算限制约束下,决策出在分析周期内成本和性能都满足要求的维护方案。最后,以劣化的水泥混凝土桥面铺装为数值算例,证明了该方法的可靠性。 The assessment of the current state and the prediction of the future condition of the deteriorating structures are crucial issues for bridge management. Time-varying loads, deteriorating resistance, as well as maintenance interventions for the sake of safety and serviceability, make the prediction very difficult. In order to perform a realistic life-cycle performance analysis of deteriorating bridge under different maintenance scenarios, the uncertainties involved have to be considered. Based on the improved deterioration model, a set of calculation formulas for reliability index under different maintenance strategies are proposed in this paper, and calculation methods for indirect maintenance cost in service time are presented. By minimizing the present value of life-cycle cost, the maintenance strategies are identified, which best balance cost and reliability index profiles over a specified time horizon under constraint of structural life-cycle performance and fiscal budget. Finally, the proposed method is applied to a deteriorating bridge surface to demonstrate its feasibility.
出处 《工程力学》 EI CSCD 北大核心 2008年第9期149-155,197,共8页 Engineering Mechanics
基金 广东省公路管理局科技项目(2006-17)
关键词 劣化桥梁 可靠指标 维护策略 寿命周期成本 优化 deteriorating bridges reliability index maintenance scenario life-cycle cost optimization
  • 相关文献

参考文献18

二级参考文献31

  • 1Jiang Y,Sinha K C.A dynamic optimization model for bridge management systems [J].Transportation Research Record,1989,1211:92-100.
  • 2Jacobs T J.Optimal long-term scheduling of bridge deck replacement and rehabilitation [J].J Transportation Eng,1992,118(2):312-322.
  • 3Cesear M,Santarnarina J C,Turkstra C J,et al.Risk-based bridge management [J].J Transportation Eng,1993,119(5):742-750.
  • 4Razaqpur A G,El Halim A O A,Mohamed H A.Bridge management by dynamic programming and neural networks [J].Can J Civil Eng,1996,23(5):1064-1069.
  • 5Miettinen K M.Nonlinear Multiobjective Optimization [M].Netherlands:Kluwer Academic Publishers,1999.
  • 6Ehrgott M.Multicriteria Optimization [M].New York:Springer-Verlag,2000.
  • 7Officer Asset Management, Department of Transportation, FHWA. Life-Cycle Cost Analysis Primer[R].2002.
  • 8Kong J S, Frangopol D M. Prediction of reliability and cost of deteriorating bridges under time-and performance-controlled maintenance [J]. J. of Str.Eng., ASCE, 2004,130(12).
  • 9Hassanain M A, Loov R E. Cost optimization of concrete bridge infrastructure[J]. Canadian Journal of Civil Engineering, 2003,30.
  • 10Liu C, Hammad A, Itoh Y. Multiobjective optimization of bridge deck rehabilitation using a genetic algorithm [J]. Computer-aided Civil and infrastructure Engineering, 1997,12.

共引文献147

同被引文献171

引证文献18

二级引证文献84

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部