摘要
应用中国电科院的PSASP程序,对山东电力研究院高压试验大厅接入电网所产生的若干问题进行了计算分析,并针对性地提出了解决措施。
PSASP applied in the paper, the problems raised by the Shandong high-voltage test hall connected to the grid are discussed, and then the solutions are put forward.
出处
《山东电力技术》
2008年第5期21-23,共3页
Shandong Electric Power
关键词
变压器
高压试验
负序电流
三相电压不平衡
零序电压
transformer
high-voltage test
negative-sequence current
three-phase voltage unbalance
zero-sequence voltage