摘要 滨海电厂护岸防浪墙顶高程的合理确定,对于电厂的安全运行至关重要。由不同规程规范确定的滨海电厂厂区护岸防浪墙顶高程相差较大,通过广西防城港电厂护岸防浪墙顶标高的确定,探讨海滨电厂合理护岸防浪墙顶高程的确定方法。 It is of great importance to properly determine the top elevation of the revetment and seawall for the safe operation of the seaside power plant. The top elevations of revetment and seawall determined according to different codes and standards are quite different from each other, this article discusses the reasonable ways to determine the top elevation of the revetment and seawall by the determination of that for the Fangehenggang power plant in Guangxi province.
出处 《山东电力技术》 2008年第5期63-66,共4页 Shandong Electric Power
关键词 电厂 护岸 防浪墙 顶标高 确定 power plant revetment seawall top elevation determination
  • 相关文献

参考文献2

  • 1南京水利科学研究院.广西中电防城港电厂一期工程波浪数模计算报告[R].2006,4.
  • 2南京水利科学薪究院.广西中电防城港电厂一期厂区防波堤护岸波浪断面物理模型试验报告[R].2005,9.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部