摘要
大跨高位连体弧形结构采用箱形梁结构形式,由于建筑结构自重较大,施工阶段支撑变形难以控制,支撑施工设计采用箱形梁与钢结构,支撑共同受力协调变形的方式,观测结果完全满足要求.
The high connecting arc - shaped structure of the larger span adopts box beam structural formation, because of the large self- weight of the building,it is hard to control the strut deformation at construction stage. The strut construction design adopts the method that the box beam and the steel structure strut coordinatied deform together, the observation result satisfy requirement completely.
出处
《吉林建筑工程学院学报》
CAS
2008年第3期54-56,共3页
Journal of Jilin Architectural and Civil Engineering
关键词
连体结构
箱形梁
钢结构支撑
connected structure
box beam steel structure strut