期刊文献+

鹤山市某城镇污水处理厂脱氮除磷工艺改造实践 被引量:4

Reconstruction Practice of Nitrogen and Phosphorus Removal Process in a Wastewater Treatment Plant of Heshan City
下载PDF
导出
摘要 鹤山市某城镇污水处理厂由于早期设计存在缺陷,出水的氨氮和总磷一直未能稳定达标。为满足达标排放的要求,在不新增主体构筑物的情况下,通过增加混合液回流系统、完善污泥回流系统、改进污泥处理流程等,将原污水处理工艺改造成为A2/O工艺,使该城镇污水处理厂处理工艺具备了脱氮除磷的功能。改造后出水水质能达到排放标准的要求。 Because the original design of a wastewater treatment plant of Heshan City had flaws, the effluent nitrogen and phosphorus were not able to reach the discharge standard. In order to meet the discharge standard, under the condition of not adding new structure, the original wastewater treatment process was reconstructed into A^2/O process by adding a mixed-liquor return system, improving the sludge recycle system, and ameliorating the sludge treatment processes. The effluent quality after reconstruction can steadily achieve the discharge standard.
出处 《中国给水排水》 CAS CSCD 北大核心 2008年第18期83-86,共4页 China Water & Wastewater
关键词 城镇污水处理厂 改造 A^2/O工艺 脱氮除磷 urban wastewater treatment plant reconstruction A^2/O process nitrogen and phosphorus removal
  • 相关文献

参考文献5

二级参考文献36

共引文献51

同被引文献39

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部