摘要
该文分析了某地下连续墙墙幅缺口产生的原因,提出了施工解决的方法。通过基坑开挖过程中信息监测数据的分析,证明了处理方法的有效性和正确性,可供今后类似工程的施工作参考。
The article analyzes the reason to produce the gap of a diaphragm and puts forward the construction solving method.Through the analysis of the information monitor data in the course of the pit excavation,the article proves the availability and correctness of the treatment method able to provide the reference for the similar projects in the future.
出处
《城市道桥与防洪》
2008年第7期121-122,共2页
Urban Roads Bridges & Flood Control