通过对攀钢实现全连铸前板坯连铸钢水过程温度变化规律及其影响因素的调查分析,建立了全连铸条件下钢水过程温度控制制度,并根据现场应用效果及存在的问题,对其进行了优化和完善。
By investigaing in and analyzing on the law of variation of the process temperature of the liquid steel and its influencing factors of the slab continuous caster prior to its being put into commissioning of 100% continuous casting in PanGang the hot metal process temperature control pattern under the 100% continuous casting condition has been established. Moreover this schedule has been optimized and improvized in light of the results of application and problems existing on-site.
出处
《炼钢》
CAS
北大核心
2008年第5期13-16,22,共5页
Steelmaking
关键词
全连铸
板坯
温度制度
优化
100% continuous casting
slab
temperature control pattermoptimization