摘要
为配合广州城市发展的需要,结合2010年第16届亚运会的举办,本文主要以广州地铁2010年预测客流为基础,考虑2010年车辆供应及设备功能实现情况,分析了广州地铁2010年的运能规划,以妥善解决届时产生的突发客流,满足2010年开通运营的230公里的线网发展需要。
To meet the needs of Guangzhou urban development, eombineding the 16th Asian Games held in Guangzhou, this article based on passenger traffic forecast of 2010, and considered the train supply and equipment function achievement, have analysised Guangzhou Metro in 2010 capacity planning, will have a proper solution to the sudden passenger flow, to meet 2010 Guangzhou Metro operating of 230km of line network development needs.
出处
《科技信息》
2008年第17期38-38,25,共2页
Science & Technology Information
关键词
广州地铁
客流预测
运能规划
Guangzhou Metro
the passenger traffic forecast
capacity planning