摘要
本文论述了公路建设过程中在规划筹建、设计、施工等各个阶段影响工程质量的潜在因素,指出了管理方面存在的问题。最后有针对性地提出了提高工程质量的措施。
The paper discussed some potential factors to effect enginecring quality in plan,design and enginecring during the highway Construction,and pointed out Some problens in management.ln the end it put forward measures to increase Construction guality.
出处
《东北公路》
北大核心
1997年第1期97-100,共4页
Northeastern Highway