兰州市小西湖黄河大桥设计参数分析与优化 被引量:2

Design Parameter Analysis and Optimization of Xiaoxihu Yellow River Bridge in Lanzhou City
下载PDF
导出
摘要 通过兰州市小西湖黄河大桥的设计,论述了部分斜拉桥孔跨的布置和梁高的选取;指出了塔高的决定除在技术经济上把握以外,还应考虑景观的需要,并通过受力计算确定了斜拉索的根数、索间距及无索区的长度;建立了以主梁弯曲应变能为目标函数,对斜拉索的初张力进行了优化分析,使结构受力行为达到最优.从而阐明了部分斜拉桥设计参数的选取过程. In this paper, through the design of Xiaoxihu Yellow River Bridge in Lanzhou,the disposal of span and choice of the beam height were discussed about partial cable-stayed bridge. It was pointed out that the height of tower should take sight effect into account except the technology and economy. The number of cable,the distance between cable and the length of non-stayed cable segment should be calculated through force analysis. Basing on the bending strain energy of main beam as objective parameters,preliminary tension of cable was optimized. This made the stress character of structure best. So the process of design parameter choice was illustrated about partial cable-stayed bridge.
出处 《兰州交通大学学报》 CAS 2008年第4期22-24,28,共4页 Journal of Lanzhou Jiaotong University
基金 兰州交通大学"青蓝"人才工程基金(QL-05-13A)
关键词 部分斜拉桥 结构布置 设计参数 优化分析 partial cable-stayed bridge structural arrangement design parameters analysis of optimization
  • 相关文献

参考文献6

二级参考文献22

共引文献167

同被引文献24

  • 1魏春明,陈淮,王艳.矮塔斜拉桥参数敏感性分析[J].郑州大学学报(理学版),2007,39(3):178-182. 被引量:15
  • 2杨立财.矮塔斜拉桥施工控制技术[J].铁道建筑,2005,45(7):34-36. 被引量:14
  • 3陈亨锦,王凯,李承根.浅谈部分斜拉桥[J].桥梁建设,2002,32(1):44-47. 被引量:107
  • 4郑一峰,黄侨,张连振.部分斜拉桥结构对比分析[J].公路,2005,50(11):15-21. 被引量:15
  • 5Venkayya V. Design of optimum structure[J]. Com- puter and Structure, 1971(1) : 265-309.
  • 6Chan 12. Optimal lateral stiffness design of tall steel buildings of mixed steel and concrete construction[J]. The Structural Design of Tall Buildings, 2001,10(3) : 155-177.
  • 7Chan C,Chui J, Huang M. Integrated aerodynamic load determination and stiffness design optimization of tall buildings[J]. Structural Design of Tall and Special Buildings, 2009,18 (1) : 59-80.
  • 8Spence S, Gioffre M. Efficient algorithms for the relia- bility optimization of tall buildings[J]. Journal of Wind Engineering and Industrial Aerodynamics, 2011,99 (6/ 7) :691-699.
  • 9Chen F,Li Q, Wu J,et al. Wind effects on a long-span beam string roof structure: wind tunnel test, field measurement and numerical analysis [J]. Journal of Constructional Steel Res~reh, 2011, 67 (10) : 1591 - 1604.
  • 10Lakzaeian F, Cantieni R. Dynamic investigation of a concrete footbridge using finite element modelling and modal analysis[J]. Structure and Infrastructure Engineering, 2013,9 (8) : 749-763.

引证文献2

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部