摘要 装配式板柱结构的空心楼盖,是由预制的空心拼板通过预应力钢筋整体张拉而形成的整体钢筋混凝土楼盖,它不同于现浇的无梁空心楼盖。文中提出了装配式整体预应力板柱结构整体结构空间分析时楼板的截面惯性矩的简化计算方法,该计算方法采用加权平均法,使空心楼盖的各部分都充分参与了计算,计算结果更接近空心楼盖的真实值,并通过工程实例的对比计算证明该简化计算方法的可行性和实用性。 Hollow floor of slab-column structure assembled different from cast-in - situ girderless hollow floor is a type of integral reinforced concrete floor which is consolidated by cored slab with stretched prestressed tendon. The simplified calculation method of sectional inertia moment for plate is proposed when analyze integral structure space of slab-column structure assembled by monolithic prestressing. It adopts weighted average method which makes all parts of hollow floor calculated and the results approach truth. The feasibility and practicability are proved through the contrast calculation of actual engineering.
出处 《工程建设与设计》 2008年第9期32-34,共3页 Construction & Design for Engineering
关键词 空心楼盖 加权平均法 截面惯性矩 简化计算方法 hollow floor, weighted average method, sectional inertia moment, simplified calculation method
  • 相关文献

参考文献4

  • 1CECS52:93整体预应力装配式板柱建筑技术规程[S].
  • 2GB50010-2002.混凝土结构设计规范[S].[S].,..
  • 3CECS175:2004.现浇混凝土空心楼盖结构技术规程[S].[S].,..
  • 4Pilli S.V. Shear Reinforcement at slab-column Connections in a reinforced concrete flat plate structure, J, ACI, 1982, V. 79, NO. 1, 36-42

共引文献2711

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部