基于定性动态对策论的建设项目监理目标控制模型研究 被引量:4

Study on Supervision Target control Model of Construction Project Based on Qualitative Dynamic Game
下载PDF
导出
摘要 为增强对项目的控制能力、获得项目的预定效益、实现项目的预期目标,根据动态对策论的性质,从局中人(承包商和监理工程师)的赢利或损失出发,通过建立、构造监理目标的定性动态对策控制模型来研究局中人各自可选择的策略使自己有利或不败、进而确定局中人的最优目标控制策略使其在长期竞争中处于动态平衡,以确保项目总目标的顺利实现。 In order to enhance the ability to control the project to obtain scheduled benefits of the project, achieving the expected goals of the project, article based on the nature of dynamic game, according to profit or lose ofthe players (contractor and supervision engineer), construct the qualitative dynamic game Control Model of Supervision to research the each optional strategies of the players which made themselves beneficial, furthermore determine the optimal target control strategies of the players to keep them the dynamic balance in long-term competition, then insuring the project targetto be realized successfully.
出处 《工程建设与设计》 2008年第9期115-117,共3页 Construction & Design for Engineering
关键词 目标控制 局中人定性动态对策 最优目标控制策略 target control players qualitative dynamic game optimal target control strategy
  • 相关文献

参考文献5

二级参考文献21

  • 1McKim R, Hegazy T, Attalla M. Project performance control in reconstruction projects[J]. Journal of Construction Engineering and Management, 2000, 126 (2): 137-141.
  • 2Rwelamila P D, et al. Total systems intervention: An integrated approach to time, cost and quality mawgement[J]. Construction Management and Economics, 1995, 13: 235-241.
  • 3Babu A J G, Suresh N. Project management with time, cost, and quality considerations[ J]. European Journal of Operational Research, 1996, 88 (2): 320-327.
  • 4Do Ba Khang, Yin Mon Myint. Time, cost and quality trade-off in project management: A case study[J]. International Journal of Project Management, 1999, 17(4): 249-256.
  • 5Shih-Wen Hsiao. Fuzzy logic based decision models for product design[J]. International Journal of Industrial Ergonomics, 1998,21: 103-116.
  • 6Roger Atkinson. Project management: cost, time and quality two best guesses and a phenomenon, it's time to accept other success criteria [J ]. International Journal of Project Management, 1999,17(6) :337 - 342.
  • 7A.J.G. Babu, N. Suresh. Project management with time,cost, and quality considerations [ J ]. European Journal of Operational Research, 1996,88 (2): 320 - 327.
  • 8Do Ba Khang, Yin Mon Myjnt. Time, cost and quality trade -off in project management:a case study[J ]. International Journal of Project Management, 1999,17(4): 105 - 114.
  • 9S.H. Al - Jibouri. Monitoring systems and their effectiveness for project cost control in construction[J]. International Journal of Project Management, 2003,21 (2): 145 - 154.
  • 10P. Crawford. P. Bryce. Project monitoring and evaluation: a method for enhancing the efficiency and effectiveness of aid project implementation[J ]. International Journal of Project Management, 2003,21 (5): 363 - 373.

共引文献188

同被引文献13

引证文献4

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部