江西省新干县黄泥埠水库除险加固工程大坝防渗墙为射水造砼防渗墙和高压旋喷灌浆防渗墙.施工中遇到防渗墙槽孔塌孔、墙体搭接、坝体开裂、坝下涵管衔接、基岩入岩控制等技术难题,通过采取一定的措施得到了较好的解决.
The cutoff wall of the dam of Huangnipu Reservoir in Xingan County is the cutoff wall of water-jetting method and highpressure jetting grouting method. The problems encountered in the construction course of the cutoff wall are introduced. At last, the treatment measures are proposed in this paper.
出处
《江西水利科技》
2008年第3期214-217,共4页
Jiangxi Hydraulic Science & Technology
关键词
水库
除险加固
防渗墙
施工
Reservoir
Strengthen
Cutoff wall
Construction