35m跨预应力箱型转换梁分析与设计

Analysis and Design of Bonded Pre-stressed Box Transfor Beam in 35m Span
原文传递
导出
摘要 对东莞大剧院工程中的预应力箱型转换梁的分析与设计进行了介绍。通过ANSYS有限元程序对箱梁进行分析,得到箱梁整体受力特点,确定箱梁侧壁计算模型,在竖向荷载作用下,侧壁可简化为平面内弯、剪构件来计算。并系统地阐述了有粘结预应力箱梁设计中预应力筋的计算方法、构造措施及施工组织等技术问题。 Through the finite element program ANSYS, a detailed analysis and design of bonded pre-stressed box beam in the project of Dongguan Great Theatre is introduced, and the features of its global mechanical behavior have been obtained. Moreover, the calculation model of side-wall of the beam is also determined here. When the side-wall is subjected to vertical load, it can be simplified to a member forced by moment and shear in plane. The method of calculation of prestressing bar and its construction measure and progress are discussed systematically.
出处 《建筑结构》 CSCD 北大核心 2008年第9期111-112,126,共3页 Building Structure
关键词 箱梁 有粘结预应力 有限元 box beam bonded prestressing finite element
  • 相关文献

参考文献1

  • 1上海市标准.预应力混凝土结构设计规程(DBJ08-69-97)[S].

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部