5Jose M, Bonfill A. Metaheuristic multiobjective optimisation approach for the scheduling of multiproduct batch chemical plants[J].Journal of Cleaner Produc- tion, 2008,16 : 233- 244.
6Rejowski R Jr, Pinto J M. Scheduling of a multiproduct pipeline system[J].Computers and Chemical Engineering, 2003,27 : 1229- 1248.
7Cafaro D C, Cerda J. Optimal scheduling of multiproduct pipeline systems using a non-discrete MILP formulation[J].Computers and Chemical Engineering, 2004,28 : 2053- 2067.
8Rejowski R Jr, Pinto J M. Scheduling of a multiproduct pipeline system[J].Computers and Chemical Engineering, 2003,27 : 1229.
9Castro P, Ignaeio. An efficient MILP model for the short-term scheduling of single stage batch plants [J]. Computers and Chemical Engineering,2006,30: 1003-1018.
10Rejowski R Jr, et al. Efficient MILP formulations and valid cuts for muhiproduet pipeline scheduling [J]. Computers and Chemical Engineering, 2004, 28:1511.