摘要
工程量清单计价模式对施工企业定额管理提出了新的要求。企业定额的管理是一个动态的管理过程。文章分析了施工企业要适应工程量清单计价模式,必须根据准确、有效的企业定额来投标报价,以此加强施工企业的经营管理和提高其竟争力。
The mode of bill with quantities evaluating puts forward the new request to the construction enterprise about the management of enterprise quota. The management of enterprise quota is a process of dynamic state. This paper analyzes the construction enterprise to want to adapt the mode of bill with quantities evaluating, must bid to quote according to the accurate and valid enterprise quota, with this strengthened management of construction enterprise.
出处
《高等建筑教育》
2008年第4期127-129,共3页
Journal of Architectural Education in Institutions of Higher Learning
关键词
工程量清单
计价模式
企业定额
科学管理
mode of bill with quantities evaluating
enterprise quota
management