摘要 白莲河抽水蓄能电站地下厂房岩锚梁开挖施工过程中,针对节理、裂隙较发育且地质构造复杂的特点,采用预留保护层分区、分步开挖方法,通过调整爆破参数和施工方法进行了多种方案的现场试验,确定了优化的开挖方案和爆破参数,取得了较好的爆破质量,积累了工程经验。 During the excavation of rock anchorage beam in the underground powerhouse of Bailianhe pumped storage power station, the methods of excavation in different areas and different steps with the preserved protection layer were adopted, taking into account the developed joints and fissures and the complicated geologic structures. Through optimizing excavation program and blasting parameters by many blasting experiments of adjusting the blasting parameters and construction methods, we have achieved preferable blasting quality and accumulated engineering experience.
出处 《水力发电》 北大核心 2008年第9期24-26,共3页 Water Power
关键词 岩锚梁 岩台开挖 地下厂房 不良地质 白莲河抽水蓄能电站 rock anchorage beam excavation of rock bench underground powerhouse unfavorable geological conditions Bailianhe Pumped Storage Power Station
  • 相关文献

参考文献6

二级参考文献14

共引文献56

同被引文献12

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部