摘要
对濮阳至信阳高速公路濮阳段路基高改低设计中桥涵设计要点加以简述,并通过增设天桥和下挖通道降低路基填土高度,解决由此引起的通道积水问题,从而实现了降低路基高度的设计目标。
The paper expounds the key points about bridge and culvert design in the engineering of reducing the subgrade height of Puyang Section of Puyang-Xinyang Expressway, and indicates adding the flying gangway and underground passage to solve the water accumulation in passages, obtains the design goal of reducing the subgrade height.
出处
《交通标准化》
2008年第19期182-184,共3页
Communications Standardization
关键词
低路基
天桥
通道积水处理
雨篷
渗水井
low subgrade
flying gangway
water accumulation disposal in passages
awning
filter well