摘要 三峡工程三期上游RCC围堰拆除爆破所用炮孔和药室采用专用刚性炮孔堵塞材料进行堵塞。这种堵塞材料的特殊组成和大流动性给其拌和及灌入水平炮孔(药室)带来一定困难,而炮孔和药室的分布则给其输送造成不便。本方案通过改变拌和投料顺序和在水平炮孔口插入弯管等技术措施,分别解决了拌和时材料粘附拌和机以及水平炮孔难以灌满等两大难题,而长距离管道输送则使该堵材的垂直和水平运输问题得到妥善解决。 All the blast-holes and charge chambers for the demolition of the upstream RCC cofferdam for the Phase-Ⅲ construction of Three Gorges Project are planned to be stemmed with a special rigid plugging material. However, the special composition and high fluidity of this kind of plugging material would bring some difficulties to the components mixing and the filling of the horizontal blast-holes and chambers, and the distribution of blast-holes and chambers would also make the conveyance of blast-hole-plugging material even more inconveniences. The scheme introduced herein has solved the problems from the adher- ence of the material to the mixer and the hard filling of the material into the horizontal blast-holes based on the technical measures of changing the material feeding sequence of the mixing and plugging bending tube into the mouth of the horizontal blasthole, and furthermore, the problem from the long distance horizontal and vertical conveyance of the material is adequately solved as well.
作者 汪传松
机构地区 三峡大学
出处 《水利水电技术》 CSCD 北大核心 2008年第10期61-64,共4页 Water Resources and Hydropower Engineering
基金 2001年度湖北省科技三项费用资助项目"工程爆破中炸药爆炸能量转化的精密控制技术研究"成果应用
关键词 炮孔堵塞 堵塞施工 围堰拆除 爆破拆除 三峡工程 blast-hole stemming stemming construction demolition of cofferdam blasting demolition Three Gorges Project
  • 相关文献

同被引文献60

引证文献5

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部