期刊文献+

地铁车站深基坑工程施工风险控制 被引量:9

Control of Deep Pit Engineering Construction Risk of Metro Station
下载PDF
导出
摘要 该文针对轨道交通地下车站深基坑施工的特点,提出了在地铁车站深基坑施工中的风险控制的重要性,从地铁车站施工方法入手,重点论述了地铁车站深基坑施工中设计和施工两大重要环节中所蕴含的风险源,并对这两者的主要风险进行识别和给出具体的施工风险防范对策,以达到事前控制的目的。 According to the characteristics of the deep pit construction of metro station in the rail traffic,the article puts forward the importance of the risk control in the deep pit construction of metro station.The article focuses the discussion on the risk sources contained two important links of design and construction in the deep pit construction of metro station,and distinguishes the main risks of these two links and gives the detail countermeasures to prevent the construction risks so as to achieve the goal of control in advance.
作者 杨玲 黄天寅
出处 《城市道桥与防洪》 2008年第10期99-101,共3页 Urban Roads Bridges & Flood Control
关键词 地铁车站 深基坑工程 风险控制 metro station deep pit engineering risk control
  • 相关文献

参考文献1

二级参考文献10

  • 1Johnson P.Evolution of risk concept.
  • 2Smelley P. The Importance of comprehensive risks management programs for large projects.
  • 3Clark G T.Addressing risk in seattle's underground.
  • 4Ott K R.A Risk assessment and analysis for an existing water conveyance tunnel.
  • 5Rozek J.Singapore's deep tunnel sewerage system:risk management form conceptual design to construction.
  • 6Brenner B.Design for construction mitigation on boston's central artery/tunnel projects.
  • 7Stepherd A.Systems engineering applications in railways.
  • 8屈晓辉.秦沈客运专线主要设计技术[M].,..
  • 9BellDE schlerferAJr.风险管理[M].哈佛大学,..
  • 10毛儒.隧道工程风险评估[J].隧道建设,2003,23(2):1-3. 被引量:57

共引文献51

同被引文献16

引证文献9

二级引证文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部