摘要
该文针对轨道交通地下车站深基坑施工的特点,提出了在地铁车站深基坑施工中的风险控制的重要性,从地铁车站施工方法入手,重点论述了地铁车站深基坑施工中设计和施工两大重要环节中所蕴含的风险源,并对这两者的主要风险进行识别和给出具体的施工风险防范对策,以达到事前控制的目的。
According to the characteristics of the deep pit construction of metro station in the rail traffic,the article puts forward the importance of the risk control in the deep pit construction of metro station.The article focuses the discussion on the risk sources contained two important links of design and construction in the deep pit construction of metro station,and distinguishes the main risks of these two links and gives the detail countermeasures to prevent the construction risks so as to achieve the goal of control in advance.
出处
《城市道桥与防洪》
2008年第10期99-101,共3页
Urban Roads Bridges & Flood Control
关键词
地铁车站
深基坑工程
风险控制
metro station
deep pit engineering
risk control