摘要
从电网运行的角度对五强溪水电厂的电气主接线存在的问题与缺陷作了探讨,并着眼于电网的长远利益,提出了较为优化的接线的方式.
This paper inquires into the problems and defects of bus bar circuit layout of Wuqiangxi hydro power station.Besides, See from the angle of long-range interests of power metwork,puts forward a more excellent wiring way.