期刊文献+

伶仃洋大桥总体布置河工模型试验研究 被引量:3

Hydraulic Modelling of the General Layout of Lingdingyang Bridge
下载PDF
导出
摘要 为加速发展珠江两岸经济,发挥粤港澳的金三角作用,有关部门拟建一座长29公里的伶仃洋跨海大桥。本文所提供的成果,是在3种水文组合条件下,对两个大桥轴线布置方案,通过河工模型反复试验,选出对该水域有关水道的泄洪、纳潮、潮排、潮灌以及冲淤变化影响较小的大桥总体布置方案,为建桥提供重要的依据。 To accelerate the economic development around Pearl River Estuary and bring into full play the golden triangle of Guangzhou-Hong Kong-Macao, a 29 km long Lingdingyang Bridge is planned to be built by relevant departments. Hydraulic model tests have been made on two schemes of the layout of the bridge axis under the combination of 3 kinds of hydrologic conditions to select a general layout of the bridge which has less influences on the channels in this water area in flood disposal, flood entry, tidaldrainage and irrigation and the change of scouring and silting. The results will present in important basis for the construction of thebridge.
机构地区 珠委科学研究所
出处 《人民珠江》 1997年第3期52-57,共6页 Pearl River
关键词 潮汐 河工模型试验 冲淤 桥梁 总体布置 tide and ebb scouring and silting return flow sanding capacity of flow hydraulic model test Lingdingyang BridgePearl River
  • 相关文献

同被引文献126

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部