摘要
从理论上分析了采用预应力混凝土桩作为码头靠船桩的可能性。
The possibility of adopting prestressed concrete pile as the berthing pile of wharf is analyzed theoretically The calculation methods for the mechanical property indices including the energy absorption (E 0) of prestressed concrete berthing pile and the impaction (P) acting on the berthing pile, etc are put forward
出处
《水运工程》
北大核心
1997年第7期12-14,共3页
Port & Waterway Engineering