摘要
110KVGIS和变压器安装是粉磨厂电气安装的重要部分。本文叙述其安装的工艺流程和要点。
The installation of 110KV GIS and voltage transformers is an important part for the electric mounting of Clinker Grinding Plant. This paper described the technological process and the critical process of installation.
出处
《港口工程》
1997年第5期41-52,58,共13页
关键词
电气安装
粉磨厂
工艺流程
变压器
水泥
electric mounting clinker grinding technological process