期刊文献+

带运输时间的无等待供应链在线调度问题研究 被引量:2

No-wait on-line supply chain scheduling problems with transfer time
下载PDF
导出
摘要 研究了供应链在线调度问题.该问题具有工件无等待、工序之间存在运输时间、加工时间介于一个区间等特点,制造商随时可能接到顾客订单,订单到达前,所有信息如订单数量、到达时间及加工时间等均未知.研究了在不改变已有工件调度的情况下,使用资源的可用时间区间最早完成临时订单的算法.计算机仿真表明,使用该算法求解大规模临时订单问题是十分有效的. This paper considers on-line supply chain scheduling problems which is characterized by no-wait, transfer time between operations, processing time between two positive limits, etc. Manufacturer may receive orders from customers at any moment. There is no any information about the coming orders such as the orders quantity, release and processing time, etc. The paper gives an algorithm which can complete the orders within the time confined by available resources without changing other jobs' schedule. The simulation results show the effectiveness of the algorithm for solving large-scale order.
出处 《控制与决策》 EI CSCD 北大核心 2008年第10期1092-1097,1102,共7页 Control and Decision
基金 国家自然科学基金项目(70671057,70771052) 教育部博士点基金项目(20051065002) 山东省泰山学者计划 青岛农业大学高层次人才启动基金
关键词 在线调度 供应链 微粒群 实时 On-line scheduling Supply chain Particle swarm optimization Real-time
  • 相关文献

参考文献11

二级参考文献49

  • 1高海兵,高亮,周驰,喻道远.基于粒子群优化的神经网络训练算法研究[J].电子学报,2004,32(9):1572-1574. 被引量:93
  • 2张超勇,饶运清,李培根,刘向军.求解作业车间调度问题的一种改进遗传算法[J].计算机集成制造系统,2004,10(8):966-970. 被引量:53
  • 3李爱国.多粒子群协同优化算法[J].复旦学报(自然科学版),2004,43(5):923-925. 被引量:398
  • 4Johnson S M.Optimal two-and three-stage production schedules[J].Naval Research Logistics Quarterly,1954,1:61 -68.
  • 5Graves S G.A review of production scheduling[J].Management Science,1981,29:646-675.
  • 6IntentiaChina.TPCO业务改进报告[R].天津:天津钢管公司,2000..
  • 7Pekny J F,Miller D L.Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods[J].Computers & Chemical Engineering,1991,15 (11):741-748.
  • 8Allahverdi A,Gupta J N D,Aldowaisan T.A review of scheduling research involving setup considerations[J].Omega,1999,27:219-239.
  • 9Koulamas C.The total tardiness problem:review and extensions[J].Operations Research,1994,12:1025-1041.
  • 10Gonzalez T,Sahni S.Flowshop and jobshop schedules:complexity and approximation[J].Operations Research,1978,26:36 -52.

共引文献93

同被引文献19

  • 1YEUNG W K, CHOI T M, CHENG T C E. Supply chain sc- heduling and coordination with dual delivery modes and inven- tory storage cost[J]. International Journal of Production Eco- nomics, 2011,132 (2) : 223-229.
  • 2KAMINSKY P, KAYA O. Inventory positioning, scheduling and lead time quotation in supply chains[J]. International Jour- nal of Production Economics, 2008,114 (1) : 276-293.
  • 3HALL N G, LIU Zhixin. Capacity allocation and scheduling in supply chains [J]. Operations Research, 2010, 58 (6): 1711-1725.
  • 4SAWIK T J. Multi-objective master production scheduling in make-to-order manufacturing[J]. International Journal of Pro- duction Research, 2007,45 (12) : 2629-2653.
  • 5NIKANDISH N, ESHGHI K. Integrated procurement, pro- duction and delivery scheduling in a generalized three stage supply chain[J]. Journal of Industrial and Systems Engineer- ing,2009,3(3) :189-212.
  • 6YAO Jianming, LIU Liwen. Optimization analysis of supply chain scheduling in mass customization [J]. International Journal of Production Economics,2009,117(1) : 197-211.
  • 7KARIMI N, DAVOUDPOUR H. A branch and bound meth od for solving multi-factory supply chain scheduling with batch delivery[J]. Expert Systems with Applications, 2014,41 (1) :8027-8048.
  • 8崔荣会,侯闯,白云川,张艳.云制造:摸不着?[J].中国制造业信息化(应用版),2010,39(3):14-17. 被引量:8
  • 9王建华,李南,郭慧.敏捷供应链静态调度模型及其贪婪算法[J].计算机应用,2010,30(3):846-849. 被引量:5
  • 10李伯虎,张霖,柴旭东.云制造概论[J].中兴通讯技术,2010,16(4):5-8. 被引量:102

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部