摘要
结合某工程概况及地层特征,详细地介绍了某PHC预应力管桩工程的施工情况及事故发生过程,对该事故进行了原因分析,同时提出了处理方案,并对本工程的经验教训进行了系统总结,从而避免此类事故的发生。
Combining with the general situation of one project and the topography features, the paper introduces the construction situation and the process of the accident of some PHC prestress tubular pile project in details. It undertakes the cause analysis of the accident, promotes the treating scheme and sums up the experiences of the project systematically, so as to avoid the similar accidents.
出处
《山西建筑》
2008年第30期143-144,共2页
Shanxi Architecture
关键词
PHC预应力管桩
事故分析
处理方案
经验总结
PHC prestress tubular pile, accident analysis, treating scheme, experience stunming-up