上游调压室设置条件的探讨 被引量:14

Discussion on the setting condition of upper surge chamber
下载PDF
导出
摘要 上游调压室设置条件是水电站引水发电管道系统初步设计的重要判据之一,本文从理论上推导了上游调压室设置条件的判别式,即压力管道中水流惯性时间常数的允许值[Tw]的大小取决于设计允许水击压力相对值ξmax、机组转速升高相对值βmax以及机组加速时间常数Ta等参数,分析了[Tw]随Ta、ξmax、βmax增大而增加的规律性,并且结合工程实例,得出了高水头水电站不设置上游调压室的[Tw]有可能远远小于2s、低水头水电站[Tw]有可能大于4s等主要结论。 The setting condition of upper surge chamber is one of the key criterions in the primary design of power station penstock Through theoretically deducing, the discriminant for setting condition of upper surge chamber is obtained, in which constant of inertia time of water flow in pressurized pipeline[ Tw ] depends on proper parameters, the allowable max. value of water hummer pressure ξmax, the max. value of unit rotating rise βmax and constant of unit acceleration time Ta . Analyzing the growing trend, [ Tw ] varied with growing of ξmax,βmax and Ta . With example of an engineering project, a main conclusion is drawn on that [ Tw ] has a probability of much smaller than 2s without setting an upper surge chamber for high head power station, while larger than 4s for low head power station.
出处 《水力发电学报》 EI CSCD 北大核心 2008年第5期114-117,共4页 Journal of Hydroelectric Engineering
关键词 水力学 上游调压室 设置条件 水击压力 机组转速升高 hydraulics upper surge chamber setting condition water hammer rising of rotating speed
  • 相关文献

参考文献3

  • 1中华人民共和国电力工业部.水电站调压室设计规范[M].北京:中国电力出版社,1997.
  • 2杨建东,詹佳佳,蒋琪.机组转速升高率的若干因素探讨[J].水力发电学报,2007,26(2):147-152. 被引量:6
  • 3中华人民共和国国家发展和改革委员会.水力发电厂机电设计规范[M].北京:中国电力出版社,2004.

二级参考文献3

  • 1王治中,孙拴厚,董育公.过渡过程机组速率升高公式的比较分析[J].杨凌职业技术学院学报,2002,1(1):18-21. 被引量:4
  • 2Г.И.克里夫琴科.水电站动力装置中的过渡过程[M].常兆堂,周文通,吴培豪译.北京:水利出版社,1981.
  • 3秋元德三.水击与压力脉动[M].支培法,徐关泉,严亚芳译.北京:电力工业出版社,1981.

共引文献8

同被引文献87

引证文献14

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部