摘要
水钢高线集卷站是由达涅利公司提供的基础设计,是由国内转化制造的,由于在原设计和国内转化制造的过程中存在的问题,在试生产过程中,设备故障频繁,作业时间周期长,作业时间与轧线速度不匹配,成为影响整个高线生产效率的瓶颈。因此根据在生产实践中所发现的问题,对原有达涅利高线集卷区设备进行升级改造,提高该区域的作业率,大大的降低了设备故障时间。
The basic design of coil collecting station at Shuicheng high speed wire mills is provided by Danieli company, China is transforming from manufacturing, as problems exist in the process of transforming the original design and domestic manufacturers, in trial production process, the equipment goes wrong frequently, the operating time cycle is long, and operating time does not match the speed of rolling, these have become bottlenecks of the efficiency of the production line. So on the basis of the problems discovered in the production practice, a part of equipment in coil collecting station is improved and redesigned to make coil collecting station become more effective, the time of the equipment failure is significantly reduced.
出处
《冶金标准化与质量》
2008年第5期53-57,共5页
Metallurgical Standardization & Quality
关键词
高速线材轧机
集卷站
鼻锥
芯棒
改进
high speed wire rod mill
coil collecting station
nose cone
reel
improved and redesigned