摘要
针对天津钢管公司750高炉主卷扬存在的与环境要求不适的缺陷,详细介绍了750高炉主卷扬系统的改造方案及做法。
In the light of the defects of being unadapted to environmental requirement existing in the main winch system of 750 blast furnace of Tianjin Pipe Corporation, this paper introduces in detail the scheme of and measures for the transformation of the main winch system of 750 blast furnace.
出处
《科技情报开发与经济》
2008年第27期206-207,共2页
Sci-Tech Information Development & Economy
关键词
技术改造
主卷扬系统
750高炉
technological transformation
main winch system
750 blast furnace