期刊文献+

Calibration of the linear optics in the SSRF storage ring 被引量:3

Calibration of the linear optics in the SSRF storage ring
下载PDF
导出
摘要 PhaseⅠcommissioning of the SSRF storage ring at 3.0 GeV was ended with encouraging results. Distortions and calibrations of the linear optics during the storage ring commissioning are discussed in this paper.The calibration procedure has reduced sextupole-additional focusing effects by minimizing closed orbit deviation and corrected quadrupole magnetic coefficients with the linear optics from closed orbit (LOCO) technique.After fitting the closed orbit response matrix,linear optics of the storage ring is substantially corrected,and the measured parameters agree well with the design.Four optics modes were commissioned,and relevant machine physics studies were carried out.Their results are summarized. Phase I commissioning of the SSRF storage ring at 3.0 GeV was ended with encouraging results. Distortions and calibrations of the linear optics during the storage ring commissioning are discussed in this paper. The calibration procedure has reduced sextupole-additional focusing effects by minimizing closed orbit deviation and corrected quadrupole magnetic coefficients with the linear optics from closed orbit (LOCO) technique. After fitting the closed orbit response matrix, linear optics of the storage ring is substantially corrected, and the measured parameters agree well with the design. Four optics modes were commissioned, and relevant machine physics studies were carried out. Their results are summarized.
出处 《Nuclear Science and Techniques》 SCIE CAS CSCD 2008年第5期257-265,共9页 核技术(英文)
基金 Supported by the SSRF project
关键词 线性光学 SSRF聚能环 同步加速器 校准 SSRF storage ring, Linear optics, Commissioning, Calibration
  • 相关文献

参考文献15

  • 1Zhao Z T, Xu H J, Ding H. Construction of Shanghai synchrotron radiation facility. Proceedings of APAC, Indore, India, 2007, 593-596.
  • 2Liu G M, Dai Z M, Li H H, et al. HEP & NP, 2006, 30 (Supp. I): 144-146.
  • 3Xu H J, Zhao Z T. Nucl Sci Tech, 2008, 19: 1-6.
  • 4Liu G M, Li H H, Zhang W Z, et al. Commissioning of the SSRF storage ring. In: Proceedings of EPAC. Genoa, Italy: 20081 2079-2081.
  • 5Robin D, Safranek J, Decking W. Phys Rev ST AB, 1999, 2: 044001.
  • 6Zhao Z T. Commissioning of new synchrotron radiation facilities. In: Proceedings of PAC. Albuquerque, New Mexico, USA: 2007, 17-21.
  • 7Portmann G, Robin D, Schachinger L. Automated beam based alignment of the ALS quadrupoles. In: Proceedings of PAC. Dallas, Texas, USA: 1995, 2693-2695.
  • 8Chung Y, Decker G.Evans K. Closed orbit correction using singular value decomposition of the response matrix. In: Proceedings of PAC. Washington D. C., USA: 1993, 2263-2265.
  • 9Safranek J. Nucl Instrum Methods Phys Res A, 1997, 388: 27-36.
  • 10Martin I P S, Bortolini R, Fielder R, et al. Electron beam dynamics studies during commissioning of the diamond storage ring. In: Proceedings of PAC. Albuquerque, New Mexico, USA: 2007, 1115-1117.

同被引文献21

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部